ADE HENDRAWAN, 1700822201033 (2024) KAJIAN FAKTOR – FAKTOR YANG DI PERTIMBANGKAN KONTRAKTOR UNTUK PENYEDIAAN ALAT BERAT EXAVATOR DI PROYEK KONSTRUKSI JALAN DI KOTA JAMBI. skripsi thesis, UNIVERSITAS BATANGHARI JAMBI.
Text
01. COVER.pdf - Published Version Download (77kB) |
|
Text
02. LEMBAR PENGESAHAN.pdf - Published Version Download (700kB) |
|
Text
03. ABSTRAK.pdf - Published Version Download (77kB) |
|
Text
06. BAB I.pdf - Published Version Download (691kB) |
|
Text
10. BAB V.pdf - Published Version Download (94kB) |
|
Text
11. DAFTAR PUSTAKA.pdf - Published Version Download (84kB) |
|
Text (KAJIAN FAKTOR – FAKTOR YANG DI PERTIMBANGKAN KONTRAKTOR UNTUK PENYEDIAAN ALAT BERAT EXAVATOR DI PROYEK KONSTRUKSI JALAN DI KOTA JAMBI)
ADE HENDRAWAN 1700822201033.pdf - Published Version Restricted to Repository staff only Download (2MB) |
Abstract
A school is a place of learning, in order to meet international standard criteria or be called an integrated school, it must be equipped with adequate study rooms and good supporting facilities aimed at contributing to the development of education in the province of East Kalimantan, for this reason the Samarinda City Government has prepared strategic steps to develop and improve the status of the school that can accommodate the needs of the community (consumers) in its area. The project implementation time which was originally planned in 430 calendar days (May 2008-July 2009) was finally re-scheduled (May 2010). The implementation of land clearing work in the Samarinda Integrated School Construction Activity is dominated by the use of heavy equipment. Selection and determination of the composition of each equipment depends on the characteristics of use, selection and determination of the right number of tools so that the equipment can operate effectively, heavy equipment costs can be reduced to a minimum so as not to result in errors and losses. The preparation of this research uses the theory of heavy equipment productivity, determining the type and number of tools according to the terrain, location and type of soil being excavated. The composition of the tools used will influence the time and costs required with the aim of finding a relationship between costs and optimum time for carrying out excavation and embankment work on land preparation for the construction of the Samarinda Integrated School during normal working hours, namely 8 hours. The results of the calculation of the optimum time required to complete the excavation and embankment work in the Samarinda Integrated School Construction Activity were 1,360 hours (170 days) with normal working hours. The costs required are Rp. 3,276,810,025.00 (Three billion two hundred seventy six million eight hundred ten thousand twenty five rupiah).
Item Type: | Thesis (skripsi) |
---|---|
Uncontrolled Keywords: | excavation and embankment work on land |
Subjects: | T Technology > T Technology (General) T Technology > TA Engineering (General). Civil engineering (General) |
Divisions: | Fakultas Teknik > Teknik Sipil |
Depositing User: | Mr Admin Repo |
Date Deposited: | 13 Nov 2024 04:57 |
Last Modified: | 13 Nov 2024 04:57 |
URI: | http://repository.unbari.ac.id/id/eprint/3699 |
Actions (login required)
View Item |